How long it takes to remodel average kitchen?

Curious about how long it takes to remodel average kitchen? Well, the duration can vary, but generally, you’re looking at anywhere between six weeks to four months, depending on the complexity of the project.

For most homeowners, the sweet spot is around six weeks to four months, balancing the desire for a swift transformation with the realities of the kitchen remodeling process. If luck is on your side and everything falls into place seamlessly, you might be sipping coffee in your revamped kitchen after just six weeks. On the flip side, if your project involves intricate planning, custom materials, and major rehaul, you might find yourself patiently waiting for the grand reveal for up to six months.

The silver lining? You can still use your kitchen for the majority of the renovation, with only about six weeks of downtime. So, whether you’re a takeout connoisseur or a microwave maestro, plan accordingly and set up a temporary kitchen space. After all, as classic as pizza is, it might start losing its charm after a while!

Now, let’s delve into the nitty-gritty of small kitchen remodel timelines based on the scale of your renovation.

How Long it Takes to Remodel Average Kitchen?

Small Scale Remodel (4-8 Weeks)

For a minor facelift involving new appliances, cabinetry, and flooring, you’re looking at a timeline of about four to eight weeks, assuming no major hiccups. If you’re avoiding major layout changes or plumbing/electrical overhauls, you could have your kitchen back in action in just a month or two. And if you’re feeling particularly adventurous with some DIY tasks like painting or flooring, you might even speed up the process.

Medium Scale Remodel (8-10 Weeks)

Thinking of adding a kitchen island or upgrading to more personalized cabinetry? For a medium-scale remodel, set your expectations at around eight to ten weeks. This type of makeover typically involves revamping appliances, lighting, fixtures, cabinetry, countertops, and flooring. Since you’re not dealing with major layout changes, the process is faster than a major renovation, and you can skip the waiting game for permits and inspections.

Large Scale Remodel (5-6 Months)

Now, if you’re going all out with a large-scale average kitchen remodel—relocating plumbing, electrical work, installing luxurious countertops, high-end appliances, and reshaping the entire space—brace yourself for a more extended timeline. Large-scale renovations usually take about five to six months, potentially longer if there are delays in getting appliances or materials. With walls coming down and a fresh start on the horizon, the reconstruction to meet your exact preferences naturally takes more time.

Factors Affecting Average Kitchen Remodel Timelines

Now, let’s explore the factors that can influence the duration of your small kitchen remodel:

1. Customizations and Tailored Materials

Opting for custom countertops and cabinetry isn’t just an extra expense; it also adds weeks to your remodel timeline. The design, sourcing, and construction phases for tailored options take time. If you’re looking for a quicker alternative, prefabricated options might be the way to go.

2. Specialized Tiles and Materials

Going for exotic, high-end materials? They take longer to acquire compared to common alternatives. While popular finishes, styles, and materials are generally readily available, specialized options may involve longer waiting times.

3. Backordered Items

If a crucial item is on backorder, be prepared for a waiting period ranging from weeks to months. Checking the availability of your chosen materials before starting the project can help you avoid unnecessary delays.

4. Labor Shortages

Ongoing shortages in labor and materials have resulted in delays in shipping, procurement, and construction. In certain cases, these setbacks could add weeks to your overall timeline. Stay informed about potential labor shortages in your area and plan accordingly.

5. Design Changes Mid-Construction

Changing your design mid-construction significantly prolongs your kitchen renovation timeline. It’s crucial to finalize your design before the construction phase begins to avoid unnecessary delays.

6. Permitting Delays

Some regions are still dealing with pandemic- or labor-related processing delays, impacting the time it takes to obtain necessary permits. Factor in potential delays in the permitting process when planning your remodel.

Average Kitchen Remodel Timeline – Breakdown of Stages

Now, let’s break down the stages of a small kitchen remodel and the time each phase typically takes:

Designing Your Kitchen (1-2 Weeks)

Before construction kicks off, the initial step is designing your kitchen. Consider hiring an architect for structural changes and aim for detailed drawings or 3D renderings for a comprehensive view. Need inspiration? Explore trendy kitchen designs online.

See Also
how to save money on kitchen remodel

Securing a Contractor (3 Weeks)

The success of your remodel hinges on the contractor, so choose a skilled, reliable local kitchen remodeling contractor. Hiring a nearby kitchen designer can ensure your design aligns with goals and budget. Interview at least three professionals, discuss timelines and budgets, and ask for references.

Obtaining Permits (2-4 Weeks)

Plan for 2-4 weeks to secure necessary permits for kitchen remodeling. Requirements vary by location, and approval takes time. Obtain permits for structural changes, plumbing, electrical work, and ventilation alterations. Delays may impact construction timelines.

Sourcing Materials (2-4 Weeks)

Selecting the right materials elevates your kitchen’s appearance. Choose fixtures, countertops, backsplash tiles, flooring, cabinetry, and paint during this phase. Shipping times vary; expect weeks, potentially months for back-ordered items.

Demolition (1-4 Days)

Clearing the way for your new kitchen involves knocking down walls, removing cabinetry, and flooring. Demolition typically spans 1-4 days.

Construction (3-6 Weeks)

Construction transforms your dream into reality. Begin with structural changes, rerouting plumbing, and electrical work.

  • Electricity and plumbing work: 1-4 days
  • Major structural changes: 2-5 weeks
  • Flooring and cabinet installation: 1-2 weeks
  • Countertop fabrication and installation: 1-2 weeks
  • Painting and backsplash installation: 2-3 days
  • Fixture, Hardware, and Appliance Installation: <1 week The finishing touches include lighting fixtures, cabinetry hardware, and appliance installation—completed in less than a week.

Conclusion of the Project (1 Day)

Post-construction cleanup, typically lasting a day, precedes the final walkthrough to ensure everything meets expectations.

So, there you have it—a comprehensive guide to the timeline of remodeling your small kitchen. Remember, each project is unique, and unexpected delays can happen. Plan ahead, stay flexible, and before you know it, you’ll be enjoying your stylish and functional new kitchen space!